Go top
Working Paper information

Minimum-cost-based electricity generation capacity planning: does annualized investment cost always yield full cost recovery with marginal pricing?

E. Centeno, F.A. Campos, J. Maguregui, S. Wogrin

Summary:

This papers presents some advances in answering the question of cost recovery of investments for the optimal technological mix in electricity systems.


Keywords: Electricity Generation Capacity Planning, Electricity Market, Cost-Recovery, Marginalist Theory


Registration date: 09-dic-2021

Citation:
E. Centeno, F.A. Campos, J. Maguregui, S. Wogrin, "Minimum-cost-based electricity generation capacity planning: does annualized investment cost always yield full cost recovery with marginal pricing?", December 2021. IIT-21-213WP.

    Research topics:
  • Co-optimización de la planificación de generación, almacenamiento y transmisión
    Research groups:
  • Instituto de Investigación Tecnológica (IIT)
Request Request the document to be emailed to you.